1,200 square meters of infrastructure has been equipped to the highest standard
Four dialysis halls have been equipped to accommodate 28 new dialysis machines
The water treatment unit has been equipped with two stations at the highest level
An electric elevator has been installed
A central oxygen unit has been prepared
A new electric generator was purchased and more than 23,419 washing sessions have been performed to date with high efficiency.
A medical analysis laboratory has been established that provides the service at a price. cost, and more than 30,000 citizens benefited from it
An x-ray unit was established, consisting of a regular x-ray and an ultrasound device, and more than 6,000 have benefited from the x-ray unit so far. Citizen
Many various medical campaigns have been carried out, the most recent of which is early detection of kidney failure, and 500 citizens have benefited from them.
The direct target group of the project
Kidney failure patients
The indirect target group of the project
The project indirectly targets groups, including the families of patients, their relatives, and school students through various health awareness campaigns, including campaigns for early detection of kidney failure and childhood anemia and the discovery of VirusC and other things in the village and neighboring villages